Portfolio
Transformer Maintenance - Image 1
Electrical Maintenance
CompletedFIPL

Transformer Maintenance

Comprehensive corrective maintenance on 2MVA 15/0.42kV transformer, identifying root causes of faults and ensuring equipment availability and reliability.

Afam Power Plant
October 2025
4 days
View Details
Borescope Inspection - Image 1
Turbine Inspection
CompletedFIPL

Borescope Inspection

Comprehensive borescope inspection on two GE Frame 5 Gas Turbines, identifying potential issues and providing actionable insights for peak performance and reliability.

Omoku Power Plant
July 2025
3 days
View Details
Repair and Fabrication of Damaged Solar Mars 100 Exhaust Stack - Image 1
Turbine Repair
CompletedNEPL

Repair and Fabrication of Damaged Solar Mars 100 Exhaust Stack

Inspection, replacement, repair, and reinstallation of Solar Mars 100 turbine exhaust stack that experienced explosion damage, restoring safe and reliable operation.

Imo River AGG Plant
July 2025
20 days
View Details
Camiller VIGV Angle Transmitter Calibration - Image 1
Control Systems
CompletedCNL

Camiller VIGV Angle Transmitter Calibration

Configuration, scheduling and calibration of 180MW GT13E2 gas turbine Variable Inlet Guide Vane using Camille specialty software to release machine interlock for startup.

Rivers IPP, Afam
July 2025
2 days
View Details
Repair of Faulty Control Valves and Actuators - Image 1
Valve Repair
CompletedNEPL

Repair of Faulty Control Valves and Actuators

Critical repair of faulty gas control valves and actuators to enable plant startup and efficient operation.

Imo River AGG Plant
July 2025
7 days
View Details
ABB Advant Control System Installation - Image 1
Automation Systems
CompletedCNL

ABB Advant Control System Installation

Replacement of damaged PM651 controllers and optimization of ABB Advant automation system logic for robust turbine protection and operation sequencing.

Rivers IPP II, Afam
April 2025
5 days
View Details
LV-MV Switchgear Maintenance - Image 1
Electrical Maintenance
CompletedFIPL

LV-MV Switchgear Maintenance

Inspection and servicing of Schneider SF2 MV circuit breakers 36KV, 2500A, and comprehensive maintenance of switchgears ensuring operational integrity and reliability.

Omoku Power Plant
April 2025
7 days
View Details
TAT Spread PLST Corrective Maintenance - Image 1
Turbine Repair
CompletedFIPL

TAT Spread PLST Corrective Maintenance

Inspection and repair of EV Burners and FDS on GT13E2 Gas Turbine (180MW), restoring unit from 90MW output limitation to baseload capacity.

Afam Power Plant
March 2025
12 days
View Details
Flare System Assessment Services for OML 18 - Image 1
Inspection & Assessment
CompletedNEOL

Flare System Assessment Services for OML 18

Inspection and assessment of flares and flare ignition systems at Alakiri, Cawthorne Channel 1, 2, and 3 flow stations with scope documentation and BEME development.

Cawthorne Channel & Alakiri, Rivers State
March 2024
3 days
View Details
Upgrade of Lightning Arrestor and Earthing System - Image 1
Electrical Systems
CompletedEnageed Resource Limited

Upgrade of Lightning Arrestor and Earthing System

Investigation and upgrade of earthing grid and lightning arresters using cutting-edge Indelec Prevectron arresters with surge counters to protect against lightning strikes.

Ajoki Flowstation, Edo State
July 2023
14 days
View Details
Liner Transition Piece Inspection (LTPI) - Image 1
Turbine Inspection
CompletedFIPL

Liner Transition Piece Inspection (LTPI)

OEM-recommended LTPI on GE Frame 5 Gas Turbine with replacement of combustion liners, transition pieces, and comprehensive ancillary works completed with zero LTI.

Trans Amadi Power Station
November 2020
9 days
View Details
Hot Gas Path Inspection (HGPI) and Exhaust System Repairs - Image 1
Turbine Inspection
CompletedFIPL

Hot Gas Path Inspection (HGPI) and Exhaust System Repairs

Root cause analysis and HGPI on GE MS 5001 Gas Turbine with replacement of combustion components, resolving high wheelspace temperature issue and restoring baseload operation.

Omoku Power Plant
June 2020
21 days
View Details